Manufacturing of metal structures

Design, manufacture and assembly of robust and durable metal structures tailored to the specific needs of our customers.

01
Luxembourg
Building Jean Monnet 2 (European Communities)
02
Luxembourg, Kirchberg
New National Library - Quadripodes under the roof
03
Mersch Station
New canopies on the platforms
04
Belval
Blast furnaces – Redevelopment of the blast furnaces
↓
RÉFÉRENCES
Client | Description | Période d'exécution | Catégorie | Prix |
---|---|---|---|---|
Metallic Bridges of Belgium | Kirchberg - Serra - Canopy | 2017 | Bridge and engineering structures | 131.000 € |
Metallic Bridges of Belgium | Livange - Motorway A4 - Expansion OA1025 | 2023 | Bridge and engineering structures | 139.600 € |
GrovenPortal | Leudelange - Raiffeisen Bank – Curtain Wall & Roof Glazing | 2013 | Glass structures | 185.000 € |
Prefalux | Wobrecken - School and Maison Relais – supporting structure and staircase | 2021 | Metal structures | 209.000 € |
Steffen Holzbau | Luxtram storage centre – Halls and indoor walkways | 2017 | Metal structures | 1.984.000 € |
Technoconsult | Belval - Biotech 3 – Technical cabins on roofs | 2024 | Metal structures | 128.280 € |
CFL | Pfaffenthal - CFL-Stop – Canopies on railway platforms | 2017 | Metal structures | 857.000 € |
CFL | Pfaffenthal - Funicular stop – Main Covers | 2016 | Metal structures | 1.565.000 € |
CFL | Contern - CFL stop – Coverage on stairs | 2017 | Metal structures | 189.000 € |
Prefalux | Cents / Fetschenhof - National Stadium for Athletics – Access stairs to the stands | 2021 | Metalwork | 252.000 € |
TAB | Crautherm - Alysea Residence – Terrace | 2017 | Metalwork | 51.000 € |
Steinfort Park - Restaurant An Der Villa - Guardrail | Metalwork | |||
CFL | Kleinbettingen - CFL-stop – Bike box, cover, railings and handrails | 2018 - 2020 | Metalwork | 690.000 € |
Felix Giorgetti | Route d‘Arlon Luxembourg - SSF – Building – Connecting bridge | 2018 | Footbridges | 78.000 € |
UVB | Clausen - Lifting footbridge to the school | 2017 | Footbridges | 259.000 € |
CFL | Howald - Multimodal hub - Facade, lift and staircase on platform | 2021 | Lift cages | 2.953.453 € |
Post Luxembourg | Luxembourg - Mercier Building – lift shafts, panoramic staircases and glass roof | 2016 | Lift cages | 1.476.000 € |
CFL | Wiltz Station - Temporary footbridge | 2024 | Footbridges | 377.125 € |
(Français) LuxPerGio | (Français) Gare de Rodange - (Français) Protection caténaire | (Français) 2024 | Metal structures | (Français) 151.590 € |
(Français) Tralux | (Français) Gare d'Ettelbruck - (Français) Plancher support containers chantier | (Français) 2024 | Metal structures | (Français) 65.000 € |
(Français) CEL | (Français) Fondations en acier pour signaux | (Français) 2024 | Metal structures | (Français) 93.240 € |
(Français) Administration communale de Bettembourg | (Français) Bettembourg - (Français) Complexe sportif - Escalier de secours | (Français) 2024 | Metal structures | (Français) 89.450 € |
Tralux | Rachlingen - 0A318 - Pedestrian and cyclist bridge | 2024 | Footbridges | 557.000 € |
(Français) Prefalux | (Français) Luxembourg - (Français) St George’s International School - Poteaux façades | (Français) 2023 | Metal structures | (Français) 54.800 € |
(Français) Prefalux | (Français) Belval - (Français) Nouvelles Archives Nationales – Plancher métallique | (Français) 2023 | Metal structures | (Français) 404.000 € |
LuxPerGio | Rodange Station - Locksmith work in the West subway tunnel | 2023 | Metalwork | 13.832 € |
(Français) Prefalux | (Français) Steinfort - (Français) Complexe sportif | (Français) 2023 | Metal structures | (Français) 35.000 € |
Spuerkeess | Installation of the Bbox (mobile cash machine) at events | 2023 | Other | 22.702 € |
Steffen Holzbau | Luxembourg - Foyer OLAI Kirchberg – Guardrails and emergency staircases | 2022 | Metalwork | 405.000 € |
(Français) Sunprotection | (Français) Strassen - (Français) Stugalux Lana - Pergolas sur terrasses | (Français) 2022 | Metal structures | (Français) 425.932 € |
Perrard | Bonnevoie - EAM CFL Building | 2022 | Metalwork | 130.000 € |
CFL | Dippach-Reckingen Station - Temporary platforms | 2022 | Other | 28.800 € |
CFL | Bettembourg Station - Footbridge spanning the plattforms | 2021-2022 | Lift cages | 1.500.000 € |
(Français) Prefalux | (Français) Luxembourg - (Français) Stade National d’Athlétisme – Poteaux, escaliers et garde-corps | (Français) 2021 | Metalwork | (Français) 252.000 € |
(Français) GalereLux | (Français) Bertrange - (Français) Immeuble Gemini - Planchers métalliques | (Français) 2021 | Metal structures | (Français) 361.000 € |
(Français) Sunprotection | (Français) Alzingen - (Français) Stugalux Diane | (Français) 2021 | Metal structures | (Français) 100.000 € |
(Français) CEL | (Français) Fondations en acier pour signaux | (Français) 2021 | Metal structures | (Français) 25.270 € |
(Français) Immo Lanners-Fonk | (Français) Bridel - (Français) Garde-corps en inox sur balcons | (Français) 2021 | Metalwork | (Français) 83.000 € |
Administration communale de Steinfort | Steinfort - Footbridge in the park | 2021 | Footbridges | 112.000 € |
SM MPP | Bettembourg - 0A14 – Acoustic glass screens | 2021-2024 | Acoustic screens | 890.000 € |
CFL | Luxembourg Station - Footbridges, canopies, platform lifts and stainless steel guardrails | 2021 - 2024 | Lift cages | 9.111.000 € |
SEBES | Eschdorf - New SEBES sewage treatment plant – Stairs | 2020 - 2024 | Metalwork | 500.000 € |
(Français) CFL | (Français) Gare de Rodange - (Français) Nouvelles marquises sur quais | (Français) 2020-2024 | Metal structures | (Français) 2.200.000 € |
CFL | Mersch Station - New canopies on the platforms | 2020-2023 | Metalwork | 4.500.000 € |
LuxPerGio | Rodange Station - Footbridge over the tracks | 2020-2024 | Lift cages | 2.850.000 € |
(Français) Steffen Holzbau | (Français) Gilsdorf - (Français) Lycée technique agricole - Garde-corps en métal | (Français) 2020 | Metalwork | (Français) 123.000 € |
AM 3OA | Cents - Luxembourg - CFL – Stop – Metal guardrails & M-Boxes | 2020 | Metalwork | 113.000 € |
Ateliers Poncin | Micheville - Liaison Micheville 0A1 – Bridge installation | 2018 | Bridge and engineering structures | 120.000 € |
CFL | Wasserbillig - Luxembourg line to Wasserbillig – Acoustic screens | 2017-2020 | Acoustic screens | 4.625.000 € |
Steffen Hozbau | Luxembourg, Kirchberg - New National Library - Quadripodes under the roof | 2017 | Metal structures | 517.000 € |
CFL | Pulvermühle - Duplication of the viaduct | 2016-2022 | Acoustic screens | 4.000.000 € |
CFL | Luxembourg Station - TEMPORARY BRIDGEWAY | 2019-2020 | Footbridges | 1.100.000 € |
GrovenPortal | Kirchberg, Luxembourg - Casa Ferrero – Curtain wall | 2018 | Glass structures | 166.000 € |
Administration des Bâtiments Publics | Luxembourg - Building Jean Monnet 2 (European Communities) | 2023-2025 | Metalwork | 4.000.000 € |
Grovenportal | Wickrange - Grid X /Motorworld – Roof glazing | 2023 | Glass structures | 205.000 € |
Le Fond Belval | Belval - Blast furnaces – Redevelopment of the blast furnaces | 2012-2016 | Metal structures | 7.500 € |