Use of varied materials

Expertise in working with different materials (steel, aluminium, stainless steel, glass) for unique projects.
- S235 to S355 quality steels
- Corten-type weathering steels
- Stainless steels
- Aluminium
- Glazing
- All types of metal cladding (expanded metal, perforated sheets, metal cassettes, sandwich panels, etc.)
- Wood cladding
01
Howald
Multimodal hub - Facade, lift and staircase on platform
02
Rodange Station
Locksmith work in the West subway tunnel
03
Mersch Station
New canopies on the platforms
04
Rodange Station
Footbridge over the tracks
05
Cents - Luxembourg
CFL – Stop – Metal guardrails & M-Boxes
06
Wasserbillig
Luxembourg line to Wasserbillig – Acoustic screens
↓
RÉFÉRENCES
Client | Description | Période d'exécution | Catégorie | Prix |
---|---|---|---|---|
Metallic Bridges of Belgium | Kirchberg - Serra - Canopy | 2017 | Bridge and engineering structures | 131.000 € |
Metallic Bridges of Belgium | Livange - Motorway A4 - Expansion OA1025 | 2023 | Bridge and engineering structures | 139.600 € |
GrovenPortal | Leudelange - Raiffeisen Bank – Curtain Wall & Roof Glazing | 2013 | Glass structures | 185.000 € |
Prefalux | Wobrecken - School and Maison Relais – supporting structure and staircase | 2021 | Metal structures | 209.000 € |
Steffen Holzbau | Luxtram storage centre – Halls and indoor walkways | 2017 | Metal structures | 1.984.000 € |
Technoconsult | Belval - Biotech 3 – Technical cabins on roofs | 2024 | Metal structures | 128.280 € |
CFL | Pfaffenthal - CFL-Stop – Canopies on railway platforms | 2017 | Metal structures | 857.000 € |
CFL | Pfaffenthal - Funicular stop – Main Covers | 2016 | Metal structures | 1.565.000 € |
CFL | Contern - CFL stop – Coverage on stairs | 2017 | Metal structures | 189.000 € |
Prefalux | Cents / Fetschenhof - National Stadium for Athletics – Access stairs to the stands | 2021 | Metalwork | 252.000 € |
TAB | Crautherm - Alysea Residence – Terrace | 2017 | Metalwork | 51.000 € |
Steinfort Park - Restaurant An Der Villa - Guardrail | Metalwork | |||
CFL | Kleinbettingen - CFL-stop – Bike box, cover, railings and handrails | 2018 - 2020 | Metalwork | 690.000 € |
Felix Giorgetti | Route d‘Arlon Luxembourg - SSF – Building – Connecting bridge | 2018 | Footbridges | 78.000 € |
UVB | Clausen - Lifting footbridge to the school | 2017 | Footbridges | 259.000 € |
CFL | Howald - Multimodal hub - Facade, lift and staircase on platform | 2021 | Lift cages | 2.953.453 € |
Post Luxembourg | Luxembourg - Mercier Building – lift shafts, panoramic staircases and glass roof | 2016 | Lift cages | 1.476.000 € |
CFL | Wiltz Station - Temporary footbridge | 2024 | Footbridges | 377.125 € |
(Français) LuxPerGio | (Français) Gare de Rodange - (Français) Protection caténaire | (Français) 2024 | Metal structures | (Français) 151.590 € |
(Français) Tralux | (Français) Gare d'Ettelbruck - (Français) Plancher support containers chantier | (Français) 2024 | Metal structures | (Français) 65.000 € |
(Français) CEL | (Français) Fondations en acier pour signaux | (Français) 2024 | Metal structures | (Français) 93.240 € |
(Français) Administration communale de Bettembourg | (Français) Bettembourg - (Français) Complexe sportif - Escalier de secours | (Français) 2024 | Metal structures | (Français) 89.450 € |
Tralux | Rachlingen - 0A318 - Pedestrian and cyclist bridge | 2024 | Footbridges | 557.000 € |
(Français) Prefalux | (Français) Luxembourg - (Français) St George’s International School - Poteaux façades | (Français) 2023 | Metal structures | (Français) 54.800 € |
(Français) Prefalux | (Français) Belval - (Français) Nouvelles Archives Nationales – Plancher métallique | (Français) 2023 | Metal structures | (Français) 404.000 € |
LuxPerGio | Rodange Station - Locksmith work in the West subway tunnel | 2023 | Metalwork | 13.832 € |
(Français) Prefalux | (Français) Steinfort - (Français) Complexe sportif | (Français) 2023 | Metal structures | (Français) 35.000 € |
Spuerkeess | Installation of the Bbox (mobile cash machine) at events | 2023 | Other | 22.702 € |
Steffen Holzbau | Luxembourg - Foyer OLAI Kirchberg – Guardrails and emergency staircases | 2022 | Metalwork | 405.000 € |
(Français) Sunprotection | (Français) Strassen - (Français) Stugalux Lana - Pergolas sur terrasses | (Français) 2022 | Metal structures | (Français) 425.932 € |
Perrard | Bonnevoie - EAM CFL Building | 2022 | Metalwork | 130.000 € |
CFL | Dippach-Reckingen Station - Temporary platforms | 2022 | Other | 28.800 € |
CFL | Bettembourg Station - Footbridge spanning the plattforms | 2021-2022 | Lift cages | 1.500.000 € |
(Français) Prefalux | (Français) Luxembourg - (Français) Stade National d’Athlétisme – Poteaux, escaliers et garde-corps | (Français) 2021 | Metalwork | (Français) 252.000 € |
(Français) GalereLux | (Français) Bertrange - (Français) Immeuble Gemini - Planchers métalliques | (Français) 2021 | Metal structures | (Français) 361.000 € |
(Français) Sunprotection | (Français) Alzingen - (Français) Stugalux Diane | (Français) 2021 | Metal structures | (Français) 100.000 € |
(Français) CEL | (Français) Fondations en acier pour signaux | (Français) 2021 | Metal structures | (Français) 25.270 € |
(Français) Immo Lanners-Fonk | (Français) Bridel - (Français) Garde-corps en inox sur balcons | (Français) 2021 | Metalwork | (Français) 83.000 € |
Administration communale de Steinfort | Steinfort - Footbridge in the park | 2021 | Footbridges | 112.000 € |
SM MPP | Bettembourg - 0A14 – Acoustic glass screens | 2021-2024 | Acoustic screens | 890.000 € |
CFL | Luxembourg Station - Footbridges, canopies, platform lifts and stainless steel guardrails | 2021 - 2024 | Lift cages | 9.111.000 € |
SEBES | Eschdorf - New SEBES sewage treatment plant – Stairs | 2020 - 2024 | Metalwork | 500.000 € |
(Français) CFL | (Français) Gare de Rodange - (Français) Nouvelles marquises sur quais | (Français) 2020-2024 | Metal structures | (Français) 2.200.000 € |
CFL | Mersch Station - New canopies on the platforms | 2020-2023 | Metalwork | 4.500.000 € |
LuxPerGio | Rodange Station - Footbridge over the tracks | 2020-2024 | Lift cages | 2.850.000 € |
(Français) Steffen Holzbau | (Français) Gilsdorf - (Français) Lycée technique agricole - Garde-corps en métal | (Français) 2020 | Metalwork | (Français) 123.000 € |
AM 3OA | Cents - Luxembourg - CFL – Stop – Metal guardrails & M-Boxes | 2020 | Metalwork | 113.000 € |
Ateliers Poncin | Micheville - Liaison Micheville 0A1 – Bridge installation | 2018 | Bridge and engineering structures | 120.000 € |
CFL | Wasserbillig - Luxembourg line to Wasserbillig – Acoustic screens | 2017-2020 | Acoustic screens | 4.625.000 € |
Steffen Hozbau | Luxembourg, Kirchberg - New National Library - Quadripodes under the roof | 2017 | Metal structures | 517.000 € |
CFL | Pulvermühle - Duplication of the viaduct | 2016-2022 | Acoustic screens | 4.000.000 € |
CFL | Luxembourg Station - TEMPORARY BRIDGEWAY | 2019-2020 | Footbridges | 1.100.000 € |
GrovenPortal | Kirchberg, Luxembourg - Casa Ferrero – Curtain wall | 2018 | Glass structures | 166.000 € |
Administration des Bâtiments Publics | Luxembourg - Building Jean Monnet 2 (European Communities) | 2023-2025 | Metalwork | 4.000.000 € |
Grovenportal | Wickrange - Grid X /Motorworld – Roof glazing | 2023 | Glass structures | 205.000 € |
Le Fond Belval | Belval - Blast furnaces – Redevelopment of the blast furnaces | 2012-2016 | Metal structures | 7.500 € |